Virtuoso + Spectre / Engineering
CMOS Inverter
Build an inverter, repair a subtle GUI-state mismatch and inspect its operating point.

A Virtuoso/Spectre transfer curve from the CMOS inverter demonstration.
NorthCUA brand edition. Editorial logos are updated; the recorded GUI sequence and timing are preserved.
Film chapters
THE REQUEST
Trace the circuit. Check the result.
Build a 1 V CMOS inverter, sweep the input from 0 to 1 V in 5 mV increments, and inspect switching and transistor states.
An input edit was not committed, leaving the saved bias at 0 V. The agent returns to the setup, confirms 0.5 V with Enter, and reruns the analysis.
The transfer crossing is estimated near 0.498 V from the 5 mV sweep. Separate device reports retain the +5.778 µA and −5.778 µA currents at the nominal 0.5 V input.
Native schematic, simulation setup, waveform state and operating-point evidence.
SELECTED RECORDED STATES
About this record
External controller using native CUA Driver MCP; separate from NorthCUA checkpoint benchmarks.
Research showcase in a prepared engineering environment, using native CUA Driver MCP outside the clean Harness release. Constructed MOS1 teaching models; not foundry validation.
Technical Report §G.4 · Figure 39 · pp. 101, 102 · 2026-11-01
